Technical Committees

Committee 1 – Roadway & Ballast

Track Functional Group

This committee is responsible for the development and publication of recommended practices and information relating to:

  • Preliminary exploration, testing, design, construction, and maintenance of railway roadbeds. This shall include soil stabilization, retaining structures and drainage.
  • Ballast types and sections.
  • Culvert types, installation and inspection.
  • Utility installation on railway rights-of-way by railways or others.
  • Fencing and roadway signs.
  • Vegetation control.
  • Tunnel design and excavation, not including lining the tunnel, which is the responsibility of Committee 8.
  • Geosynthetic materials for railway applications.

Chair

Richard C. Zaluski, II

Asst. Chief Engineer - Construction

Norfolk Southern Railway

Email: rczalusk@nscorp.com

Vice Chair

Terrance M. Bodine, PE

Director of Rail Services

Patrick Engineering Inc.

Email: tbodine@patrickco.com

Secretary

Christopher S. Moale, PE

Engineer Standards

CSX Transportation

Email: chris_moale@csx.com

Ballots

The following ballots have now been approved by the Board of Directors in November 2017. The material will be included in the next edition of the applicable AREMA publication, and will be available for sale. For information on purchasing publications, please contact M. Bruins at +1.301.459.3200.

All AREMA materials, including pending ballots, are protected by international copyright laws.

Posted 11/03/17

Subcommittees and Current Assignments

Subcommittee A: Recommendations for Further Investigation and Research.

Subcommittee B: Revision of Manual.

Subcommittee 1: Roadbed

D1-1-14: Develop recommendations for Ground Improvement Techniques.

Subcommittee 2: Ballast

D2-1-11: Use of recycled concrete. Ongoing assignment.

Subcommittee 3: Natural Waterways

D3-1-11: Review and revise Evaluating Local Scour at Abutments. Ongoing assignment.

D3-1-16: Review/revise section 3.8 Construction & Protection of Roadbed Across Reservoir Areas

Subcommittee 4: Culverts

D4-2-13: Update Section 4.19 Culvert Inspection. Ongoing assignment.

D4-1-15: Develop recommendations for use of Corrugated Polypropylene Pipe. Ongoing assignment.

Subcommittee 5: Utilities

D5-5-09: Pipeline Installation Inspection Field Checklist. Ongoing assignment.

D5-1-13: Investigate and update casing criteria for pipelines crossing the railroad right of way. Ongoing assignment.

D5-1-16: Prepare section on overhead and underground wireline crossings in Part 5 Pipelines.

D5-2-16: Overhead and Underground Wireline Crossings and Encroachements.

Subcommittee 6: Fences

Subcommittee 7: Roadway Signs

Subcommittee 8: Tunnels

D8-3-13: Develop micro-tunneling recommendations.

D8-3-16: Develop recommendations for Pilot Tube Method of Micro-tunneling

Subcommittee 9: Vegetation Control

Subcommittee 10: Geosynthetics

C10-1-96: Develop recommended practice for the use of geosynthetics for stabilization of the track roadbed. Monitor applicable research on goesynthetics for information that will strengthen AREMA recommendations. Ongoing assignment.

D10-4-13: Develop recommendations for use of microporous filter composites. Ongoing assignment.

D10-2-14: Create Section 10.0 Introduction to Geosynthetics.

D10-2-15: Develop recommendations for use of woven geotextile fabrics.