This committee is responsible for the development and publication of recommended practices and information relating to:
- Preliminary exploration, testing, design, construction, and maintenance of railway roadbeds. This shall include soil stabilization, retaining structures and drainage.
- Ballast types and sections.
- Culvert types, installation and inspection.
- Pipeline installation on railway rights-of-way by railways or others.
- Fencing and roadway signs.
- Vegetation control.
- Tunnel design and excavation, not including lining the tunnel, which is the responsibility of Committee 8.
- Geosynthetic materials for railway applications.
Ballots
The following ballots have now been approved by the Board of Directors on November 2011. The material will be included in the next edition of the applicable AREMA publication, and will be available for sale. For information on purchasing publications, please contact B. Caruso at +1.301.459.3200.
Posted 10/31/11
- Ballot #01-09-02, Chapter 1, revised Section 1.5 Recommended Practices for Road Crossing Foundations (Committee 5 has amended their section)
- Ballot #01-11-02, Chapter 1, revised Sections 3.1 General and 3.2 Hydrologic Capacity of Waterway Openings
- Ballot #01-11-03, Chapter 1, revised Section 3.3 Determination of Hydraulic Capacity of Structures
Posted 10/17/11
- Ballot #01-10-02, Chapter 1, update and rewrite by Sub-Committee Four on Section 11 Culvert End Treatments and Section 14 Culvert Rehabilitation
- Ballot #01-10-03, Chapter 1, update and rewrite of Section 9 "Design Criteria for Corrugated Metal Pipes" and Section 10 "Design Criteria for Structural Plate Pipes"
- Ballot #01-11-01, Chapter 1, HDPE use on RR.
Papers
Sub-Committees and Current Assignments
Sub-Committee A: Recommendations for Further Investigation and Research.
Sub-Committee B: Revision of Manual.
Sub-Committee 1: Roadbed
Sub-Committee 2: Ballast
D2-1-03: Write a recommended standard for undercutting and ballast shoulder cleaning.
Sub-Committee 3: Natural Waterways
D3-1-01: Update and rewrite Manual Section.
Sub-Committee 4: Culverts
D4-1-94: Update Manual Parts 1.4.9 and 1.4.10.
D4-1-01: Study corrugated polyethylene pipe for use within railroad rights-of-way.
D4-1-06: Update Manual Parts 4.11 and 4.14.
Sub-Committee 5: Pipelines
D5-1-02: Recommended Practice for Directional Boring on Railroad Right of Way.
D5-2-02: Revise Fiber Optic Installation Section 5.5.1.
D5-1-08: Damage Prevention to Underground Facilities.
D5-5-09: Pipeline Installation Inspection Field Checklist.
Sub-Committee 6: Fences
D6-2-94: Sand Fences.
D6-1-01: Review and update Part 6 – Fences.
Sub-Committee 7: Roadway signs
Roadway signs section rewrite in progress.
Sub-Committee 8: Tunnels
D8-1-87: Review and update Manual recommendations for tunnels.
Sub-Committee 9: Vegetation Control
C9-2-89: Review and update Manual text on recommendations for vegetation control. Ongoing assignment.
Sub-Committee 10: Geosynthetics
C10-1-96: Develop recommended practice for the use of geosynthetics for stabilization of the track roadbed. Monitor applicable research on goesynthetics for information that will strengthen AREMA specifications. Ongoing assignment.
Chair
Perly A. SchovilleSystem Engineer
Union Pacific Railroad
1400 Douglas St Stop 0640
Omaha, NE 68179-0002
(T): (402) 544-0725
(F): (402) 233-3084
Email Perly A. Schoville
Vice Chair
David H. WarnockSenior Project Manager
Parsons
10235 S Jordan Gtwy Ste 300
South Jordan, UT 84095-4187
(T): (801) 631-5315
(F): (801) 572-9069
Email David H. Warnock
Secretary
Richard C. Zaluski, IIPrincipal Design Engineer
Norfolk Southern Railway
1200 Peachtree St NE
Atlanta, GA 30309-3579
(T): (404) 658-2293
(F): (404) 658-2333
Email Richard C. Zaluski, II